Everbright Water adheres to its engineering construction philosophy of "Excellent Design, State-of-art Technology, Advanced Equipment, High Quality Construction and First Class Management", and proactively applies for engineering construction-related qualifications, such as "Grade A for Environmental Protection Engineering Projects", "Grade B for Mechanical and Electrical Installation", "Safe Production License" and "National Industrial Product Manufacturing License".
In the meantime, Everbright Water has steadily developed an advanced engineering management system, which keeps every process of the construction project under strict control, and ensure all construction work is conducted safely and orderly, in order to develop benchmark projects with high quality, high standard and advanced technology.
In 2023, Everbright Water consistently applied the principle of "Building for Use" by planning the progress of construction according to the operation needs, thereby enhancing the project construction capability and improving the quality of construction. During 2023, the Group had 18 projects that commenced construction, with a designed daily waste water treatment capacity of 325,000 m3; and 13 projects that completed construction and commenced operation, with a designed daily waste water treatment capacity of 130,000 m3. As at 31 December 2023, the Group had 9 projects in the preparatory stage, with a designed daily waste water treatment capacity of 292,000 m3.